Over the holidays we had a lot of work done in the school kitchen and school hall.
The hall had two cracks in the roof at each end of the room repaired and the whole ceiling was painted. Theold lights were replaced with new ones and the sound proof tiles were also replaced with new ones. So we now have a very nice looking ceiling!
The kitchen had a lot of work done! The floor was recovered with new lino and the servery area of the kitchen was fitted with new equipment including a hot and chiled unit for keeping the food while the children are getting their lunch. A new dishwasher, not a washing machine as mentioned in the newsletter, was put in and it washes and dries the dishes put in in three minutes or so!
So overall we are delighted with the improvements.